Please reread “New Plaster/Stucco Wall”. The long and short of it is that we got, and paid for permits that were not necessary. We got the same look that we wanted in the original block wall with a ½” plaster/stucco specification. As expected, the Kel-Crete Premium Liquid Admixture in the mix design performed as it always has for fifty-three years. And the Kel-Prime mixed 50/50 with water was applied to the stucco finish coat that saved us 25 days in construction time. Lastly the new wall meets EPA Leeds and carbon footprinting standards.

Share This